Skip to main content
O Trucking

Critical Path LTD

  • Active
  • Intrastate Only (Non-Hazmat)
  • Motor Carrier

Phone (303) 437-6824Lakewood, CO

Carrier information from FMCSA records. See dates and record coverage. How to verify an FMCSA record.

USDOT
USDOT3090484
MC
None
Registered
2018 · 8 yrs
Location
Lakewood, CO
MCS-150 filed
Mar 11, 2026

USDOT registration

Active

Registration status; not operating authority

Authority record

No filing shown

Check current status in Motus

Insurance record

No filing shown

Does not establish uninsured status

Safety rating

Not rated

No safety rating available; not a safety verdict

Overview

The short version and the key numbers.

Critical Path LTD is an active motor carrier based in Lakewood, CO, registered with FMCSA under USDOT 3090484. Phone: (303) 437-6824. It reports 2 power units and 1 driver on its MCS-150 (Mar 11, 2026). In the last 24 months it had 2 roadside inspections, a 0% vehicle out-of-service rate (national average 23%) and no reportable crashes in the available records.

USDOT 3090484 was first registered with FMCSA on Jan 27, 2018 (8 years ago), and its most recent MCS-150 filing is dated Mar 11, 2026. Its vehicles were inspected 2 times on record, most recently on Jun 29, 2026, most often in CO.

2Power units, as filed
1Drivers, as filed
2Inspections (24 mo)
0Crashes recorded (24 mo)
10,000Miles per year (2026)

Equipment on record

Straight TruckInspection

VIN = decoded from the carrier's vehicles · Inspection = seen at roadside inspections · MCS-150 = filed by the carrier

Dates behind this profile

MCS-150 filing
Mar 11, 2026
Registration record changed
Oct 24, 2026
Latest inspection recorded
Jun 29, 2026
Latest crash recorded
Not available
Latest vehicle observation
Jun 29, 2026

Each date applies to its own record. A registration change does not mean every filing changed. An inspection or vehicle observation describes that date, not continuous operation today.

USDOT registration and operating authority are different records. A crash entry records involvement, not a finding of fault. Missing information is not a clean safety record.

Not on file for USDOT 3090484: connected companies.

Company details

Filed identity, officers, contacts and registration details.

Company identity & officers

Company officer
Brian Dannenberger
Legal name
Critical Path LTD
Classification
Private (Property)
Registered as
Motor Carrier

Registration & filings

USDOT number
3090484
Docket numbers
None on file
Registered
Jan 27, 2018 (8 yrs)
Last MCS-150
Mar 11, 2026
Usual MCS-150 schedule
April 2028 (see temporary relief below)
Operation
Intrastate Only (Non-Hazmat)
Hazmat, as filed
No
Passenger carrier, as filed
Not available

FMCSA currently provides additional time for biennial updates due on or after June 1, 2026 and suspends USDOT inactivation for those missed updates. The usual schedule above does not establish a violation. Read our update guide and the cited FMCSA notice (guidance checked October 20, 2026).

Carriers in Lakewood, CO

USDOT registrations in Lakewood
1,355
Currently active
888 (66%)
One-truck operations
928 (68%)
With for-hire authority
306 (23%)
Registered in the last 12 months
50

From FMCSA census records as of Nov 28, 2026. This carrier reports 2 power units against a local average of 12.8.

Contact and registration identifiers

USDOT
3090484
Phone
(303) 437-6824
Email
briandberger1@gmail.com
Officers
Brian Dannenberger
Legal name
Critical Path LTD
Address
857 S Van Gordon Ct #C103, Lakewood, CO 80228
VINs inspected under this USDOT
1M2AA18C91W142489
Plates inspected under this USDOT
DGF135 CO

Available registration and contact identifiers. Vehicle identifiers below are a recent sample; open a VIN or plate to see its dated records.

Legitimacy check

A quick screen from public records. A flag is a reason to verify, not proof of wrongdoing.

  • Pass:
    Not on the U.S. sanctions list

    Name does not match the Treasury OFAC list.

  • Pass:
    USDOT registration is active

    FMCSA lists USDOT 3090484 as active.

  • No data:
    No authority filing shown

    This is not a finding of unauthorized operation. Requirements depend on the operation; verify the current registration in Motus.

  • Pass:
    No federal out-of-service orders

    None on record for this USDOT.

  • Pass:
    No prior revocation linked

    No earlier revoked USDOT is linked to this one.

Authority & insurance

Stored filing details and guidance for checking current status.

FMCSA filing records

Authority, insurance and notice records can include earlier filings. Read each recorded status and effective date; a filing alone does not confirm current authority or insurance coverage. Missing records do not establish unauthorized operation or missing insurance.

Amounts are shown exactly as filed, without scaling or currency conversion. Confirm coverage and amounts with the insurer.

Operating authority

0 available records · FMCSA release date: Nov 28, 2026. The release date applies to this collection, not the effective date of every filing.

No matching filings available here. This does not establish that no filing exists.

Insurance filings

0 available records · FMCSA release date: Nov 28, 2026. The release date applies to this collection, not the effective date of every filing.

No matching filings available here. This does not establish that no filing exists.

Suspension and revocation notices

0 available records · FMCSA release date: Nov 28, 2026. The release date applies to this collection, not the effective date of every filing.

No matching filings available here. This does not establish that no filing exists.

Insurance history

0 available records · FMCSA release date: Nov 28, 2026. The release date applies to this collection, not the effective date of every filing.

No matching filings available here. This does not establish that no filing exists.

Earlier FMCSA filing records

These records may omit later filings. Their presence does not establish current authority or coverage. Missing records do not establish that a carrier is unauthorized or uninsured. Check current records in FMCSA Motus, then confirm coverage directly with the insurer. Follow the verification guide and its FMCSA sources. Guidance checked October 20, 2026.

Safety

FMCSA's rating and how this carrier compares with the national average.

Safety rating

Rating
Not rated
Driver inspections (24 mo)
2 (0 out of service)
Vehicle inspections (24 mo)
2 (0 out of service)

Out-of-service rates (24 months)

Vehicle0%
Better than the 23% national average (dark marker)
Driver0%
Better than the 6.3% national average (dark marker)

FMCSA BASICs

FMCSA BASIC scores
CategoryPercentileMeasureInspections with violationAcute / criticalAlert
Unsafe DrivingNot public131NoNot available
Hours-of-ServiceNot public00NoNot available
Driver FitnessNot public00NoNot available
Controlled SubstancesNot public00NoNot available
Vehicle MaintenanceNot public4.41NoNot available

Percentile: 0 is best, 100 is worst. FMCSA flags an alert above its threshold (65–80% depending on category). Some property-carrier percentiles are not public.

Most-cited violations, in plain English
Most-cited violations
CodeWhat it meansTimesOut of service
392.2-SLLEQP—10
392.2-SLLS4State/local laws — Speeding 15+ mph over limit10
392.2-SLLSIV—10
392.2SLTRS—10
393.60C—10
393.9A-LBL—10

Inspections & crashes

Roadside inspections and reportable crashes in the last 24 months.

2Inspections (24 mo)
7Violations (24 mo)
0Out of service (24 mo)
0Crashes (24 mo)
0Fatal crashes
0Deaths
0Injury crashes

Inspection, violation and out-of-service counts: FMCSA 24-month inspection record, as of Nov 28, 2026.

Most recent

Last inspection
Jun 29, 2026

Latest inspections

Latest roadside inspections
DateInspection IDStateLocationLevelDriver viol. / OOSVehicle viol. / OOSViolations
Jun 29, 202688288836COPlatteville CoWalk-around (Level 2)0 / 01 / 0
1 violation
  • 392.2-SLLEQP392.2-SLLEQP · Vehicle
Mar 18, 202687339137COCentennial CoFull (Level 1)3 / 03 / 0
6 violations
  • State/local laws — Speeding 15+ mph over limit392.2-SLLS4 · Driver
  • 392.2-SLLSIV392.2-SLLSIV · Driver
  • 392.2SLTRS392.2SLTRS · Driver
  • 393.60C393.60C · Vehicle
  • 393.9A-LBL393.9A-LBL · Vehicle
  • 396.17C-PI396.17C-PI · Vehicle

Browse all available inspection records

A roadside out-of-service finding applies to the inspected driver or vehicle; it is different from a federal order against the carrier. Crash involvement does not determine fault or preventability. Counts cover the stated reporting period, not the carrier’s entire history.

Where its vehicles were inspected

Roadside inspections by state
StateInspectionsWith OOS
CO · Colorado20

The states where FMCSA recorded roadside inspections for this USDOT. A rough picture of where the fleet runs, not a list of lanes.

Fleet & drivers

Filed fleet and driver counts, cargo types, and vehicles observed at inspections.

Vehicles filed on the MCS-150

Vehicles filed on the MCS-150
VehicleOwnedTerm leasedTrip leased
Trucks200

Drivers

Total drivers
1
CDL drivers
0
Interstate, over 100 mi
0
Interstate, within 100 mi
0
Intrastate, over 100 mi
0
Intrastate, within 100 mi
1
Leased drivers / month
Not available

Operations

Power units
2
Trucks
2
Buses
0
Annual miles
10,000 (2026)
Seen at inspections
1 truck

Vehicles inspected under this USDOT

1Power units / trucks inspected
Most recently inspected vehicles
VINYearMake & modelTypePlateInspectionsLast seenViolations / OOS
1M2AA18C91W1424892001Mack ChStraight TruckDGF135 CO2Jun 29, 20265 / 0

Vehicles recorded at roadside inspections under this USDOT (the carrier operated them; this is not a record of ownership). Open a VIN or plate for its dated carrier associations and available history. Plates can change or be reassigned. Vehicle details reflect filed records and available VIN decoding; these observations are not a complete fleet or ownership history.

Browse all available vehicle records

Equipment evidence

  • Straight TruckInspection 1 straight truck recorded at roadside inspections

Cargo carried, as filed

General FreightBuilding MaterialsMachinery (Large)Garbage/RefuseConstruction

Changes & history

Dated changes, earlier values and filing history for this registration.

Timeline of this registration

  1. Most recent vehicle recorded at a roadside inspection.
  2. Most recent roadside inspection on file.
  3. First vehicle recorded at a roadside inspection under this USDOT.
  4. Earliest roadside inspection on file.
  5. MCS-150 filing on record.
  6. Registered with FMCSA as USDOT 3090484.

Dates come from FMCSA filings and inspection records as filed; a filing date is when FMCSA recorded it, not when an event happened on the road.

MCS-150 filings on record

  1. MCS-150 filed

Registration

First registered with FMCSA
Jan 27, 2018
Last MCS-150 update
Mar 11, 2026

Questions & answers

Quick answers, written from this carrier's FMCSA record.

Is Critical Path LTD an active carrier?

The available FMCSA record lists USDOT 3090484 as active. Registration is separate from operating authority and insurance coverage.

What is Critical Path LTD's USDOT number?

USDOT 3090484. No MC, MX or FF docket number is on file.

How do I contact Critical Path LTD?

As filed with FMCSA: phone (303) 437-6824; email briandberger1@gmail.com; address 857 S Van Gordon Ct #C103, Lakewood, CO 80228.

What is Critical Path LTD's safety rating?

No FMCSA safety rating is available here. Not rated does not mean safe or unsafe.

How many trucks and drivers does Critical Path LTD have?

Power units: 2; drivers: 1, as filed on its MCS-150 (Mar 11, 2026).

What does Critical Path LTD haul?

Its FMCSA filing lists these cargo types: general freight, building materials, machinery (large), garbage/refuse, construction.

What equipment does Critical Path LTD operate?

On government records: Straight Truck (1 straight truck recorded at roadside inspections).

How many inspections and crashes has Critical Path LTD had?

Inspections: 2; crashes recorded: 0, in the available 24-month records.

What is the usual MCS-150 update schedule for Critical Path LTD?

The usual USDOT-digit schedule gives April 2028. The latest filing stored here is Mar 11, 2026. FMCSA currently gives extra time for biennial updates due on or after June 1, 2026 and has suspended inactivation for those missed updates. This calculated date is not a finding of noncompliance. Check the linked FMCSA notice for changes.

Reviews

From brokers, shippers and drivers who worked with this carrier.

No published reviews yet. Worked with Critical Path LTD? Your review helps others decide.
Write a review of Critical Path LTD

We email you a link to verify. Reviews are third-party opinions, moderated before publishing.

GoodCheck thisProblemNo data or not applicable Carrier information from FMCSA records. Filing dates and reporting periods are shown with the relevant records.

Ready to Grow Your Trucking Business?

Dispatch support for your trucking business. Explore our current service options.